Hull #2555 Restoration Begun
Posted: Mon Apr 08, 2019 2:30 pm
Hey Guys,
So my restoration work has begun! Thought I'd share some photos of progress and my overall project plan. I have read through a LOT of your guys's posts on the various work you have all done and I am very impressed by all of you. Here's the full album: https://imgur.com/a/XZjuKTS
Current Plan:
1. First float in April. If no leaks, proceed. If leaks, identify leaks. -- COMPLETE (she floats, possible leaks, but not noticeable at this time)
---
2. Replace bulkheads -- IN PROGRESS
3. Keel Horn Repair
4. Complete a full rig of all items, identify what needs replacement
5. Take measurements for Sails
6. Drill inspection hole for starboard coffin bunk to inspect and possibly add fiberglass support for oil canning
7. Boat Cushions by Amy
-- Sailing authorized at this point.
8. Receive new sails (June)
9. Build wooden gantry crane
10. Identify further interior repairs needed
11. Begin repairs on internal hull and fiberglass
12. Design and build interior
13. Acquire porta-potty after platform is built
2019 To-Do:
1. Keel Horn Repair -- IN PROGRESS
2. Clean and Sterilize interior -- IN PROGRESS
3. Bulkhead Reconstruction -- IN PROGRESS
4. Outer Hull Paint -- In Sourcing (Pricing out at local yards, otherwise Gantry Crane at In-Laws')
5. Keel Winch Cable -- In Procurement (E-Mail out to Stephen @ http://www.sjsailboats.com)
6. Find motor -- In Sourcing (prices seem all over the place)
7. Take measurements for sails
So my restoration work has begun! Thought I'd share some photos of progress and my overall project plan. I have read through a LOT of your guys's posts on the various work you have all done and I am very impressed by all of you. Here's the full album: https://imgur.com/a/XZjuKTS
Current Plan:
1. First float in April. If no leaks, proceed. If leaks, identify leaks. -- COMPLETE (she floats, possible leaks, but not noticeable at this time)
---
2. Replace bulkheads -- IN PROGRESS
3. Keel Horn Repair
4. Complete a full rig of all items, identify what needs replacement
5. Take measurements for Sails
6. Drill inspection hole for starboard coffin bunk to inspect and possibly add fiberglass support for oil canning
7. Boat Cushions by Amy
-- Sailing authorized at this point.
8. Receive new sails (June)
9. Build wooden gantry crane
10. Identify further interior repairs needed
11. Begin repairs on internal hull and fiberglass
12. Design and build interior
13. Acquire porta-potty after platform is built
2019 To-Do:
1. Keel Horn Repair -- IN PROGRESS
2. Clean and Sterilize interior -- IN PROGRESS
3. Bulkhead Reconstruction -- IN PROGRESS
4. Outer Hull Paint -- In Sourcing (Pricing out at local yards, otherwise Gantry Crane at In-Laws')
5. Keel Winch Cable -- In Procurement (E-Mail out to Stephen @ http://www.sjsailboats.com)
6. Find motor -- In Sourcing (prices seem all over the place)
7. Take measurements for sails